Spotted this ship at loyang offshore supply base. I still remember when this ship was first built around year 2000 at Jurong shipyard, I was there to commission the Integrated Bridge System(IBS) delivered by Kongsberg Marinetime Singapore. It took me 3 months to fully commission it. A very tough and fulfilling assignment.